We are passing the original notice of maintenance from the PhoenixNAP datacenter where your VPS is located. 


================================================================ 

DATE OF MAINTENANCE: May 26, 2015 


START TIME: 2:00am MST (GMT -7) 


END TIME: 5:00am MST (GMT -7) 


1. REASON FOR MAINTENANCE: 

a. Repairing manufacturer defect to prevent an unplanned outage 


1. MAINTENANCE DETAILS: 

1.a. Prevent inner windings of transformer core from rubbing on outer windings 

1.b. CET’s (Critical Environment Technicians) to repair a manufacturer defect 


It was brought to our attention that there was a manufacturing defect in some of our Power Distribution Boards (PDBs). These are the devices that supply electrical power to the branch circuit(s) supplying power to your colocation space. For safety and reliability, this defect *has* to be repaired, and in order to do so, we will need to de-energize the PDB for a short time. 

================================================================ 


We will be gracefully shutting down all our equipment @ PhoenixNAP on May 26 at around 01:40 AM MST (GMT-7) to avoid any data loss. Services will be brought up again as soon as we receive a notification from the datacenter that the maintenance is complete. 


We will be working closely with the datacenter staff to minimize possible downtime. 


Taking into account that PhoenixNAP had a very similar maintenance procedure done just a few days ago and assuming this one will be similar we expect that the total downtime will be about an hour. 


Daniel C 

Bandwagon Host/IT7 Networks Inc



亲爱的浪潮主机客户,

我们是通过维护原来的注意从phoenixnap数据中心在您的VPS位于。

================================================================

日期:2015年5月26日维护

开始时间:凌晨2:00 MST(格林威治时间7)

结束时间:上午05点MST(格林威治时间7)

1。原因维修:

A.修理制造缺陷防止计划外的中断

1。维修细节:

1。A.防止变压器铁芯内绕组擦外绕组

1。B级的(关键环境技术人员)修复制造缺陷

它带给我们的注意,有一些我们的配电板制造缺陷(PDB)。这些都是对分支线路供电的设备(s)到您的托管空间供电。安全性和可靠性,这一缺陷* *需要修理,为了这样做,我们将需要去激励PDB的时间很短。

================================================================

我们将优雅地关闭所有设备”phoenixnap五月二十六日在01:40是MST(gmt-7)以避免数据丢失。服务再次被提出当我们收到的数据中心,维修完成的通知。

我们将以数据中心的工作人员密切合作,尽量减少停机时间。

考虑到phoenixnap十分相似的保养程序,前几天刚做的,假设这将是一个类似我们预计总的停机时间将大约一小时。

丹尼尔C

浪潮主机/ IT7网络有限公司


« 上一篇 下一篇 » admin原创文章,转载请注明出处! 标签:搬瓦工主机再次维护

相关日志:

«   2019年11月   »
123
45678910
11121314151617
18192021222324
252627282930
控制面板
您好,欢迎到访网站!
  [查看权限]
网站分类
文章归档
网站收藏
友情链接
图标汇集
  • 又拍云
  • 订阅ipvb的RSS 2.0聚合